Saudi Electric Company operates PP-8 and PP-7 power plants in Riyadh. The control systems of these plants required replacing, including all related components and accessories.
  • CLIENT
    Saudi Electric Company
  • PROJECT
    10.5 million Saudi riyals

Scope:

  • Detailed engineering, supply, installation, and testing and commissioning of new control system.
  • Supply and installation of redundant UPS system and redundant batteries.
  • Dismantling existing power cables, grounding cables and design, supply, and installation of new cables, control cables and grounding cables for continuous operating load as per requirements.