Upgrade Bar Mill PLC from Siemens S5 to S7 at Saudi Iron and Steel Company (Hadeed) in Jubail

Hadeed, located at Jubail in the Eastern Province, sought a complete automation solution at the bar mill in its steel plant.
  • CLIENT
    Sabic
  • PROJECT
    3.6 million Saudi riyals
  • SOLUTION
    AUTOMATION &TRAINING
  • YEAR
    2014

Scope:

  • Turnkey project including hardware and software engineering generation of all drawings and documentation, and testing and commissioning PLCs and SCADA systems. Supply and installation of all control and communication parts.
  • Engineering, supply, factory acceptance testing, installing, testing and commissioning of new Siemens S7 PLCs to replace obsolete S5 PLCs, complete with all required hardware, software licenses, and pre-assembled cabinets.
  • Dismantling existing power and grounding cables and design, supply, and installation of new power cables, control cables and grounding cables for continuous operating load as per requirements.