Control and Communication Upgrade System at Assir Water Transmission Facilities

IICS was commissioned to upgrade the control and communication system on the Assir Water Transmission Facilities’ trunk line between the Shuqaiq desalination plant and Abha.
  • CLIENT
    Saline Water Conversion Corporation
  • PROJECT
    35 million Saudi riyals
  • SOLUTION
    AUTOMATION & TRAINING
  • YEAR
    2014

Scope:

  • Replace control and communication systems at pumping stations and reservoirs with PLC and SCADA systems.
  • Interconnect all PLCs with redundant industrial Ethernet, with suitable HMI for operator console within the stations.
  • Replace communicating RTUs in pumping stations, reservoirs, section valve stations and tapping point stations.
  • Implement all existing logics and control loops.
  • Design and modify control loops as per specifications and requirements.